calfordseaden provides a full range of services for commercial and industrial sector projects. Our specialist teams bring together the disciplines from across the Practice to offer either a stand-alone service or fully integrated solutions.
Featured Projects
Building 2, Minster Court
London
This project involved a fully coordinated design for the office accommodation on the first floor of Minster Court.
The Scalpel
London
Provision of a fully coordinated M&E design brief for the category B fit-out of levels one to three on behalf of our client, Axis.
20 Fenchurch Street (Walkie Talkie)
London
Fitting out from the shell and core status approximately 39,000 m2 office accommodation at 20 Fenchurch Street.
30 St. Mary Axe (Gherkin)
London
M&E services involving an electrical services installation for an aesthetic upgrade being undertaken to the building.
100 Cheapside
London
Office fit out to levels 8 and 9 at 100 Cheapside, consisting of approximately 1114 m2 of open plan office accommodation.
Langham Hotel
London
calfordseaden were appointed to modernise five lifts at the 5 star Langham Hotel in London.
6 Bevis Marks
London
The fit out of this central London Office building, consisting of approximately 1114 m2 of open plan office accommodation.
Building 5
Hertfordshire
A complete office fit-out within new premises for Pitney Bowes Head office.
Meet The Team
Simon Gray
DMS I Eng ACIBSE
Partner
Dr Terry Keech
BEng Hons PrD CEng MCIBSE MIE MIEE
Equity Member +44 (0)7872 033329
Patrick Inns
IEng ACIBSE
Partner - Mechanical Engineer
Perry Wright
IEng ACIBSE
Partner - Mechanical Engineer/Sustainability Advisor
Oliver Down
HNC
Senior Engineer
Jacqui Clarke
AMEI OCDEA BREEAM AP MIEnvSc
Sustainability Consultant
Roger Day
Dip Arch PG Dip Arch RIBA MCIAT
Partner - Architect
Teja Biring
BSc (Hons) BA Arch (Hons) RIBA
Partner - Architect
Stephen Jones
ONC
Associate - Architectural Technologist
Lee Walker
BA (Hons) Arch DIP Arch. RIBA. ACIAT
Associate - Architect